Kate Heyhoe

Kate's Global Kitchen
 

Global Gourmet's
Kitchen Remodel Series

 
5A 5B
5A
Before:
The doorway from a side entry-hall looking into old kitchen.  
 
5B
During:
Same doorway, after tearing out paneling and installing drywall. The passageway is now open from floor to ceiling and is wider. Note the red horizontal strip on the floor in foreground: This was where another wall and double door passage was before we knocked out the entire wall.

Click here to return to:
Part 5: From Demolition to Drywall

 
 

FoodWine's Kitchen Remodel Series
(with Survival Recipes)

 

Copyright © 2001, Kate Heyhoe. All rights reserved.

 


Current Kate's Global Kitchen
Kate's Global Kitchen Archive

 
 

This page created March 2001
Top